work breakdown structure (WBS)
  • wibas CMMI Browser
  • Glossary
  • work breakdown structure (WBS)
  • wibas CMMI Browser
  • Glossary
  • work breakdown structure (WBS)

    work breakdown structure (WBS)

    Summary

    An arrangement of work elements and their relationship to each other and to the end product or service.

    Is included in

    Glossary
    The glossary defines the basic terms used in CMMI models.
    Version 2.2 © 2021 wibas GmbH | Impressum | Privacy Policy